Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Content layer
id1449488883
Content column
id1449488885
Content block
id1449546683

On this page

Table of Contents
maxLevel4

Content block
id1449488884

Before installing and configuring the Teamcenter Integration plugin, ensure that the following software requirements are met:

The Teamcenter Integration plugin works with specific third party server products. So in addition to the above requirements, you must have access to:

  • Teamcenter 11.2.24
  • Active Workspace 3.3.2

Tip
titleRecommendation

Default data mapping is based on the Teamcenter Systems Modeling and Requirements Management components. It is recommended to use a Teamcenter instance with these components.


Requirements for enabling file management and Analysis Request functionalities

To be able to use file management commands and import Analysis Request, the following features must be installed on the Teamcenter server:

In the Extensions > Model Management > Server group:

    • Gateway for Modeling1

In the Extensions > Model Management > Server > UML SysML Modeling group:

    • Magic Draw UML SysML Modeling1

In the ExtensionsProduct Line Engineering (may be named System DrivenProduct Development) group:

    • Analysis Request Programming Interface2
    • Product Line Engineering Request2 (may be named Verification and Validation Planning and Reporting)
    • Measurable Attributes and Targets3 (may be incorporated into System Modeling and Verification and Validation Planning and Reporting)

In the Extensions > Systems Engineering and Requirements Management group:

    • Requirements Management4
    • Systems Engineering3

In the Active Workspace > Sever Extensions group:

    • Requirements Management4
    • Systems Engineering3
    • Systems Modeling3

In the Active Workspace > Sever Extensions > Product Line Engineering (may be named System DrivenProduct Development) group:

    • Measurable Attributes and Targets3 (may be incorporated into Systems Modeling and Verification and Validation Planning and Reporting)
    • Product Line Engineering Request2 (may be named Verification and Validation Planning and Reporting)

In the Active Workspace > Client group:

    • Architecture Modeler3
    • Requirements Management4
    • Systems Modeler3

In the Active Workspace > Client > Product Line Engineering (may be named System DrivenProduct Development) group:

    • Measurable Attributes and Targets3 (may be incorporated into Systems Modeling and Verification and Validation Planning and Reporting)
    • Product Line Engineering Request2 (may be named Verification and Validation planning and Reporting)


1
- Requires the TC31018 - Teamcenter Gateway for Model Management licence.
2 - Requires the TC030202 - Design Validation Planning and Reporting licence.
3 - Requires the TC030203 - Teamcenter Systems Modeler licence.
4 - Requires the TC030101 - Requirements Manager User licence.


Content block
id1449488882

Related pages