The Magic Teamcenter Connector works with specific third party server products. So in addition to the above requirements, you must have access to:
Teamcenter 11.4
Active Workspace 3.4
Tip
title
Recommendation
Default data mapping is based on the Teamcenter Systems Modeling and Requirements Management components. It is recommended to use a Teamcenter instance with these components.
Requirements for enabling file management and Analysis Request functionalities
To be able to use file management commands and import Analysis Request, install the following Teamcenter Mechatronics Engineering 2.4.1 kit features on the Teamcenter server:
In the Extensions > Model Management > Server group:
Gateway for Modeling1
In the Extensions > Model Management > Server > UML SysML Modeling group:
Magic Draw UML SysML Modeling1
In the Extensions > Product Line Engineering (may be named System DrivenProduct Development) group:
Analysis Request Programming Interface2
Product Line Engineering Request2 (may be named Verification and Validation Planning and Reporting)
Measurable Attributes and Targets3 (may be incorporated into System Modeling and Verification and Validation Planning and Reporting)
In the Extensions > Systems Engineering and Requirements Management group:
Requirements Management4
Systems Engineering3
In the Active Workspace > Sever Extensions group:
Requirements Management4
Systems Engineering3
Systems Modeling3
In the Active Workspace > Sever Extensions > Product Line Engineering (may be named System DrivenProduct Development) group:
Measurable Attributes and Targets3 (may be incorporated into Systems Modeling and Verification and Validation Planning and Reporting)
Product Line Engineering Request2(may be named Verification and Validation Planning and Reporting)
In the Active Workspace > Client group:
Architecture Modeler3
Requirements Management4
Systems Modeler3
In the Active Workspace > Client > Product Line Engineering (may be named System DrivenProduct Development) group:
Measurable Attributes and Targets3 (may be incorporated into Systems Modeling and Verification and Validation Planning and Reporting)
Product Line Engineering Request2(may be named Verification and Validation planning and Reporting)
1 - Requires the TC31018 - Teamcenter Gateway for Model Management licence. 2 - Requires the TC030202 - Design Validation Planning and Reporting licence. 3 - Requires the TC030203 - Teamcenter Systems Modeler licence. 4 - Requires the TC030101 - Requirements Manager User licence.