Validation can run on: To start the validation of the entire model or its part To validate the diagram, table, matrix, or relation map To validate the element(s)
- Validation Suite.
- Validate For.
- Minimal Severity.
Learn more about each of the option >>
The model or its part is validated against the selected validation suite.